Module 1: Getting Started Module 1 单元检测

1、 问题:Which party takes over the project and put it into use?
选项:
A:The Employer
B:The Contractor
C:The Engineer
D:None of the above
答案: 【The Employer

2、 问题:Normally, which party will design, execute and complete the works and remedy the defects thereof?
选项:
A:The Employer
B:The Contractor
C:The Engineer
D:None of the above
答案: 【The Contractor

3、 问题:In general, the stages of project delivery/procurement do not include
选项:
A:The Preparatory Stage
B:The Tendering Stage
C:The Design Stage
D:The Construction Stage
答案: 【The Design Stage

4、 问题:Generally speaking, prequalification is a part of        in international project delivery/procurement.
选项:
A:The Preparatory Stage
B:The Tendering Stage
C:The Design Stage
D:The Construction Stage 
答案: 【The Tendering Stage

5、 问题:Which of the following marks the beginning of the construction stage?
选项:
A:Execution of Works
B:Mobilization and Commencement of Work
C:Completion and Taking-over Certificate
D:Defects Notification Period
答案: 【Mobilization and Commencement of Work

Module 2: Stylistic Features and Formats of ECEM Module 2 单元检测

1、 问题:Which of the following is not the stylistic characteristic prominent in the English for international construction engineering and management?
选项:
A:Specialization of general words
B:Nominalization
C:Succession of nouns
D:Application of rhetorical devices 
答案: 【Application of rhetorical devices 

2、 问题:Which of the following is the reason of the extensive use of nominalization in the English for international construction engineering and management? 
选项:
A:To avoid grammatical error
B:To render objective description
C:To express personal feelings
D:To attract reader’s interest
答案: 【To render objective description

3、 问题:非限定动词的形式主要包括     。
选项:
A:动词不定式
B:动名词
C:分词 (现在分词+过去分词)
D:以上三者
答案: 【以上三者

4、 问题:Which of the following is not a case of nominalization?
选项:
A:The identification of defects
B:Extension of time
C:To submit the tender
D:In conformity with the standards
答案: 【To submit the tender

5、 问题:Which of the following statements about passive voice in English is true?
选项:
A:Passive voice shows interest in the person or object that performs the action.
B:Passive voice is easier to read and understand than active voice.
C:Passive voice is seldom used in the English for international construction engineering and management.
D:Passive voice is commonly used when the performer of the action is unknown of unimportant.
答案: 【Passive voice is commonly used when the performer of the action is unknown of unimportant.

Module 3: Cross-Cultural Communication Module 3 单元检测

1、 问题:我们应以何种心态对待异域文化?
选项:
A:假定对方与自己有类似的想法、判断和价值观念
B:认为对方的文化比自己的文化更加优秀
C:认为对方的文化比自己的文化更加落后
D:假定对方与自己的想法、判断和价值有一定差异
答案: 【假定对方与自己的想法、判断和价值有一定差异

2、 问题:高语境文化具有的特点是       .
选项:
A:交流信息含蓄委婉,字面意思下通常还有隐含的意义
B:对语言形式具有较强的依赖,强调语言形式的完整和准确
C:交流信息客观直白,通常字面的意思就是说话人想要表达的全部意思
D:信息的正确传递说话人负责
答案: 【交流信息含蓄委婉,字面意思下通常还有隐含的意义

3、 问题:根据文化的冰山模型,以下哪一项属于文化的深层结构?
选项:
A:食物和就餐方式
B:信仰系统
C:政府机构和法律法规
D:艺术形式
答案: 【信仰系统

4、 问题:以下哪一项不利于国际工程管理中的跨文化沟通?
选项:
A:坚信冲突对项目是百害而无一利的
B:接受在项目管理过程中各方会出现不同的想法
C:建立和维持适当的沟通渠道
D:熟悉工程项目合同的条件与条款
答案: 【坚信冲突对项目是百害而无一利的

5、 问题:在国际工程项目管理工作中,跨文化沟通应该是       的工作?
选项:
A:翻译人员
B:外联人员
C:全体项目人员
D:高层管理人员
答案: 【全体项目人员

Module 4: Parties to the Contract Module 4 单元检测

1、 问题:Normally, the Engineer acts as        in a construction contract.
选项:
A:The Employer’s Representative
B:The Contractor’s Representative
C:The Donor’s Representative